Excited to be appointed as Principal Designer for the construction of a skate park, for Pitstone Parish Council.
Duties include
Principal designer duties
Client advisor
H&S Inspections
Excited to be appointed as Principal Designer CDM advisor for the complete refurbishment of a 4 storey building in Hampstead Heath.
Duties include
Principal designer duties
Client advisor
H&S Inspections
Happy to announce appointment to carry out review of Principal Contractors documents and procedures for the refurbishment works at a central London Hotel.
Complete strip out and renovation of grade II listed building.
Services provided
H&S inspections
Construction phase plan review
Advice and guidance
Excited to see contracts signed and works to start on site at Pitstone Sports Pavilion. Client very happy with the design and choice of Contractor. Works start on site 6th June.
Principal Designer Works
Pre construction Information document
Attend design meetings
Identify significant risks and make recommendations
F10 Notification to HSE
Construction Leadership Council
Construction Sector – Site Operating Procedures
Protecting Your Workforce During Coronavirus (Covid-19)
Construction sites operating during the Coronavirus (Covid-19) pandemic need to ensure they are protecting their workforce and minimising the risk of spread of infection. This includes considering how personnel travel to and from site.
This guidance is intended to introduce consistent measures on construction sites of all types and sizes in line with the Government’s recommendations on social distancing and ensure employers and individuals make every
effort to comply.
Call us today, to receive free advice and guidance.
Glad to see new website is up and running. Thanks to the IT backroom team. Much Appreciated